37s over the Metrolink. Surely not?

In late January 2009,the second Metrolink relaying contract was in full swing and the ELR had been contracted to provide locomotives and drivers to haul the works trains. DB Schenker brought the materials to site. 30th Jan saw a trainload of long welded rails arrive from Warrington – which was stabled with 37418 ready to go out that evening – and a rake of empty MTA ballast wagons depart. 37901 brought the wagons up to Bolton Street station from the yard at Baron Street (below and middle) for the main line motive power (66152 and 66250) to take back to Warrington (bottom). Oh and the weather couldn’t have been better!

37418_Bury

37901_Bury

37901_Bury_2

66152_Bury

Below: 37109 leaves ELR metals and heads onto Metrolink (running wrong line) with a train of MTA/MHA ballast wagons.

37109_Metrolink

Marcheys House

This rural backwater on the Blyth & Tyne route used to be a busy place. No longer, and since these photos were taken, it has got even quieter. Both trains pictured have ceased running as Alcan have stopped Aluminium production at the Lynemouth smelter.

60044_Marcheys

60044 passes with 6V49 Lynemouth to Newport ADJ block train. At the time, a 60 on this traffic was far from common with a 66 being more commonly rostered. Shortly after this was taken, the block train to Newport was altered to run to Tees Yard and then onto Newport after that.

66103_Marcheys

66103 passes with the Lynemouth-North Blyth empty alumina tanks for reloading. A number of trips used to run between the two conveying alumina for smelting at the works. DB Schenker lost the work to GB Railfreight a couple of years after this photo and then shortly after Alcan announced they were shutting the Lynemouth plant. This resulted in the end of the local trip workings, the only train remaining being the daily North Blyth-Fort William block train.

09/08/06