37s over the Metrolink. Surely not?

In late January 2009,the second Metrolink relaying contract was in full swing and the ELR had been contracted to provide locomotives and drivers to haul the works trains. DB Schenker brought the materials to site. 30th Jan saw a trainload of long welded rails arrive from Warrington – which was stabled with 37418 ready to go out that evening – and a rake of empty MTA ballast wagons depart. 37901 brought the wagons up to Bolton Street station from the yard at Baron Street (below and middle) for the main line motive power (66152 and 66250) to take back to Warrington (bottom). Oh and the weather couldn’t have been better!

37418_Bury

37901_Bury

37901_Bury_2

66152_Bury

Below: 37109 leaves ELR metals and heads onto Metrolink (running wrong line) with a train of MTA/MHA ballast wagons.

37109_Metrolink

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s